Fran Fruzen Intermediate School

PROJECT DESCRIPTION

Sustainable Engineering Group was hired to provide commissioning, geothermal engineering and energy modeling services for the new Fran Fruzen Intermediate School. SEG worked with the Design Team to model a variety of energy conservation measures, including automatic dimming daylighting controls and high efficiency geothermal heat pumps. In addition, we provided complete design services for a geothermal heating and cooling system. In the end, we estimate that this school will use 49% less energy than a typical K-12 school.

  • Energy Modeling to Assist Design Team
  • Geothermal heating and cooling system
  • (Expected) Focus on Energy Design Incentive

PROJECT DETAILS

Client: Beloit School District
Location: Beloit, WI
Square Footage: 100,000
Year Built: 2015