Fort Atkinson School District Schools

PROJECT DESCRIPTION

Fort Atkinson School District carried out major energy efficiency renovations in four of their schools, totaling 450,000 ft². This work included the installation of geothermal heat pumps, envelope upgrades, electric and lighting modifications, two solar hot water systems to heat their pools, a 50 kW wind turbine, and two 20 kW solar electric systems. Sustainable Engineering Group’s services included: design and construction commissioning (including the renewable energy systems), energy modeling, LEED assessment, Measurement and Verification, incentive administration, ENERGY STAR® certification and creating and updating the district-wide energy plan. After 3 years of operation, the school district is one of the most energy efficient in the state – consuming only 33 kBtu/SF/yr. Also, 4 of the 6 schools have been ENERGY STAR® certified.
Click here for SE2 Poster.

PROJECT DETAILS

Client: Fort Atkinson School District
Location: Fort Atkinson, WI
Square Footage: 450,000
Years of Service : 2005-15
Certification: Energy Star Certified (4 schools)