Edgerton Hospital and Health Services

PROJECT DESCRIPTION

Sustainable Engineering Group worked with Edgerton Hospital on their new 60,000 sq ft “green village” medical campus. The largest building, and the first to be designed and constructed, involved a “green” hospital facility. The building systems have been designed to be as energy efficient as possible and include a large geothermal heat exchange field coupled with water-to-water geothermal heat pumps.

PROJECT DETAILS

Client: Edgerton Hospital and Health Services
Location: Edgerton, WI
Square Footage: 60,000
Year Built: 2009
LEED Certification: Designed to LEED NC 2.2