News & Events

 

Sustainable Engineering Group worked with Edgerton Hospital on their new 60,000 sq ft “green village” medical campus. The largest building, and the first to be designed and constructed, involved a “green” hospital facility. The building systems have been designed to be as energy efficient as possible and include a large geothermal heat exchange field coupled with water-to-water geothermal heat pumps. Click here to read a recent article about how geothermal technology has paid off for Edgerton Hospital.